Delivery and proof
Coordinate final cargo delivery in Nepal, including receiving windows, unloading records, signed receipts and proof shared with parties closing the file.
- Dispatch
- Final delivery
- Proof of delivery
What it covers
- Delivery scheduling with the consignee and the site.
- Unloading evidence and signed delivery receipts.
- Status updates through the movement, and a record at the end of it.
- Proof of delivery issued and circulated to the parties who need it on file.
- Phased delivery to a site, with a record at each drop rather than one at the end.
- Exceptions reported when they happen, with the next action named.
How it runs
A movement is not finished when the cargo reaches Nepal. It is finished when the consignee has it and the record says so. Final delivery is coordinated to the site, phased where a site can receive only part of a consignment at a time, and the proof is collected rather than assumed. One multi-container movement to western Nepal was closed this way, with unloading evidence and a signed delivery receipt for every container.

Where it runs
Kathmandu Valley, Birgunj, Amlekhgunj, Narayanghat, Nepalgunj and Surkhet, and directly to project sites where the cargo is bound for construction rather than a warehouse.
Documents and records
Delivery order, delivery receipt, site delivery report, photographs and proof of delivery, followed up until the file closes.
Define completion before the vehicle leaves
Final delivery starts with receiving readiness: the correct address and site contact, access and vehicle restrictions, receiving hours, unloading equipment, package sequence and the person authorised to sign. For phased or multi-container movements, define which pieces belong to each drop. That keeps one receipt from being mistaken for completion of the whole consignment.
During delivery, record dispatch, arrival, unloading and handover against the shipment references. If cargo is short, damaged, refused or only partly accepted, capture the exception at the time, identify the affected packages and name the next action. Photographs may support the record, but the agreed signed or electronic proof and any exception note are what show the consignee's response.
Before departure, agree who must receive the close-out record and what the proof should contain. This avoids a completed physical handover remaining open because the document went to the wrong party or omitted the shipment reference.
- Send the receiving party a practical pre-arrival notice and confirm changes rather than relying on the original plan.
- Circulate proof only after it has been matched to the delivery, packages and recipient.
- Close the file when all planned drops are evidenced or every remaining exception has an owner and status.
A related documented movement
Six containers unloaded at NepalgunjPlanning questions
What counts as proof of delivery?
The record depends on the movement: a signed delivery receipt, site report, unloading evidence or photographs may be needed. KCPL follows up on the agreed proof and circulates it to the parties who need it to close the shipment file.
Can a consignment be delivered in stages?
Yes, where the site and transport plan support it. Agree the piece list, receiving contact, unloading equipment and hours for each drop in advance; each phase should have its own receipt so missing or damaged pieces are not hidden inside a final total.
Useful to tell us
Delivery address, site contact, unloading equipment available, receiving hours.